Everyone knows that the shows on DIY Network and other videos taking 24 minutes to renovate a house are not true. In fact, there’s a lot of things you need to consider before you can fully renovate a house. In Mobile, you can ask for remodeling companies near me that can help you with your renovating project. However, if you just want to do it by yourself, you need to check out to make sure that you didn’t forget the major elements and you involved everything that should be. 

 

Step by Step Guide

 

Step 1: Design and Planning

 

A sketch on a cocktail napkin, full-blown architectural plans, or just a firm set of thoughts about how to remodel should progress. It is cheaper and less frustrating to correct mistakes before the remodel takes physical form. Ensure that you have funding for your renovation.

Draw up a simple “yes/no” list of do-it-yourself projects and projects you want professionals to do. Look for contractors and subcontractors for those jobs you do not want to do yourself. And don’t forget to apply for permits.

 

Step 2: Roof, Foundation, Water Issues, Siding, Windows

 

Roof replacement or repair; foundation fix; stopping water infiltration; installing or repairing siding and windows. Large projects must be done first because subsequent projects are impacted by them.

 

Secure the foundation. Protect your future renovation work by making certain the house won’t collapse on you (foundation, major structural problems) and that it will remain dry (roof, siding, windows). Make major foundation repairs to areas such as weakened walls, joists, and carrying beams.

 

Repair or replace the roof. Replace seriously damaged windows that may threaten future remodeling work. If not seriously damaged, leave it for later in the process. If the siding is so damaged that it will allow water infiltration, repair or replace the siding. If not seriously damaged, leave it for later in the process.

 

Step 3: Demolition

 

Demolishing and disposing of sections of the house that will be replaced by later projects. Rent a large container for waste. Carefully demolish all or some of the areas of the house that will be renovated. Demolish as much as possible if you will not be living in the house.

Exercise caution when demolishing surfaces coated with lead-based paint.

Step 4: Structural Carpentry

 

Carpentry that is in support of other work such as drywall, new or moved walls, windows, doors, etc. Moving and constructing new walls. Significantly enlarging the window openings. Adding beams to support a greater weight upstairs. Punching in new doors (or removing existing doors) and adding new construction windows.

Step 5: Electrical and Plumbing

 

These are the vital services that need to be installed when the walls and ceiling are open. With the walls and ceiling open, it is time for the company to install ductwork for central heating and air conditioning. Run new electrical and plumbing systems. 

 

Step 6: Insulation

 

Laying the insulation in the walls and ceiling. Install fiberglass insulation in the walls and attic. Insulation goes fast, so make sure that your drywall company is ready to go soon after this.

 

Step 7: Drywall

 

Closing up the walls with drywall: hanging it, mudding it, and sanding it. A second inspection from the electrical inspector (and perhaps the plumbing inspector) will give you the go-ahead to close up the walls. Drywallers hang sheets of drywall, apply drywall compound, and let the compound dry. After drying, they sand it smooth. Sometimes, they will repeat the process until they achieve a seamless surface.

 

Step 8: Fine Carpentry

 

Carpentry that is not supportive: baseboards, molding, trim around windows and doors, built-in elements (bookcases, breakfast nooks, etc.). Fine carpenters give your house that finished touch.

 

Step 9: Interior Painting, Wallpaper, and Other Surface Finishes

 

Painting interior walls, hanging wallpaper, painting molding and trim, staining and sealing trim. All of these detail-oriented surface finishes should be one of the last items you do indoors as this work can damage other work of yours.

 

Should you paint before installing or sanding your flooring or the reverse? This is debatable. Laying flooring first means that paint might get on the flooring. Painting first means that the floor sander may scuff your walls.

 

Step 10: Flooring

 

Your final floor covering—laminate, solid hardwood, tile, engineered wood. Installing the flooring as late as possible in the renovation process saves your flooring surface from significant damage.

 

We have laid out these steps so that you can renovate a house a on your own. But we also suggest that you should at least hire some professionals to do the job. All you have to do is just check if things are going as you have planned.